2 Temporada
10 Episodio
Murder City - Season 1 Episode 1 Episodio 1 (2006)
When a 16-year-old girl disappears from her home, leaving a blood-spattered bedroom behind, Susan and Luke start trying to track down the missing teenager, hoping that she may still be alive. Meanwhile, the mysterious death of a City trader who is shot in the neck with an arrow proves a tough case to crack.
- País :
- Género : Drama
- Estudio : STV
- Director :
- Emitir : Kris Marshall, Amanda Donohoe, Tim Woodward, Geff Francis, Alexis Conran, Amber Agar