This Old House Season 45 Episode 11 Lexington: Electrical Bond 2023
5.2/10by 30 users
Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.