Dan Rather Reports

8 Temporada
93 Episodio

Dan Rather Reports - Season 2 Episode 31 Episodio 31 ()

Top former and current Boeing engineers believe the new 787 Dreamliner should not be certified to fly since it was built primarily out of high tech plastics called composites. And from Florida, dolphins in danger because people are loving them to death.


(1 votes, average: 7.00/ 10)

105 minutos 2024 HD

  • Share
img

Temporada